Duplicating a Step
- Open
the Load Plan Editor:
- Navigate
to the Steps tab in the Load Plan Editor.
- Select
the Step to Duplicate:
- In
the Steps Hierarchy table, right-click on the step you want
to duplicate.
- Duplicate
the Step:
- From
the context menu, select Duplicate Selection.
- New
Step Created:
- A
copy of the selected step (including its child steps) will be
created and added as a sibling step after the original step in the
Steps Hierarchy table.
- Move
and Edit the Duplicated Step:
- You
can now move the duplicated step to a different position within the
hierarchy or edit its properties as needed.
No comments:
Post a Comment