Duplicating a Step

  1. Open the Load Plan Editor:
    • Navigate to the Steps tab in the Load Plan Editor.
  2. Select the Step to Duplicate:
    • In the Steps Hierarchy table, right-click on the step you want to duplicate.
  3. Duplicate the Step:
    • From the context menu, select Duplicate Selection.
  4. New Step Created:
    • A copy of the selected step (including its child steps) will be created and added as a sibling step after the original step in the Steps Hierarchy table.
  5. Move and Edit the Duplicated Step:
    • You can now move the duplicated step to a different position within the hierarchy or edit its properties as needed.

 

No comments:

Post a Comment