LoadPlan Regenerate Scenarios

  1. Open the Load Plan Editor:
    • Navigate to the Steps tab or Exceptions tab in the Load Plan Editor.
  2. Select the Load Plan Step:
    • In the Steps Hierarchy table, select the Load Plan step whose scenarios you want to regenerate. This includes regenerating scenarios for any child steps as well.
  3. Right-click the Selected Step:
    • Right-click on the selected Load Plan step.
  4. Select "Regenerate":
    • From the context menu, select the Regenerate option. Note: This option will not be available if the scenario has the version number -1.
  5. Confirm the Action:
    • A confirmation prompt will appear. Click OK to confirm the regeneration of the scenarios.

 

Caution:

  • Regenerating a scenario cannot be undone. It's important to be cautious when regenerating scenarios, especially for critical scenarios. If necessary, consider creating a new version of the scenario rather than regenerating the existing one.

No comments:

Post a Comment