Replace a Scenario FAQS
- What
does "Import Replace" do?
- The
Import Replace option allows you to replace an existing scenario
with an exported one, effectively updating it. Any existing sessions,
reports, and schedules related to the original scenario will be replaced
by those in the exported file.
- Where
can I use the "Import Replace" option?
- The
Import Replace option is available in Designer or Operator
Navigator. You must right-click the scenario you wish to replace and
select Import Replace....
- What
happens to the original scenario when I use Import Replace?
- The
original scenario is completely replaced with the contents of the
exported scenario file. Any associated data, such as sessions, reports,
and schedules, will be updated based on the export file.
- Do
I need to specify a file when replacing a scenario?
- Yes,
you need to specify the scenario export file in the Replace
Object dialog in order to replace the existing scenario with the
exported one.
- Can
I replace multiple scenarios at once?
- The
Import Replace process is used to replace a single scenario
at a time. To replace multiple scenarios, you would need to repeat the
process for each one.
- What
happens if the exported scenario has different schedules or settings?
- When
using Import Replace, the schedules, sessions, and other settings
in the exported scenario will replace those of the original
scenario. Make sure the exported scenario has the correct configurations
before performing the replacement.
- Is
it possible to undo the replacement of a scenario?
- Once
a scenario is replaced using Import Replace, it cannot be easily
undone. It's advisable to back up the original scenario or ensure that
you have the correct export file before proceeding with the replacement.
No comments:
Post a Comment